|  | List of projects > Rouge River Bridge (Highway 50)
|
 |
| Grenville-sur-la-Rouge, QC, Canada |
 |
Project Features
Completion: 2011
- Type of structure: 1,240-foot (378 m), eight-lane highway bridge
- General contractor: Construction Demathieu et Bard (CDB) Inc.
- Consulting engineer: Genivar
- Owner: Quebec Ministry of Transportation
Construction of a bridge over the Rouge River for the Highway 50 completion project in the Laurentians region of Quebec.
Products and services
- Structal-Bridges
- Fabrication and installation of all structural steel components (2,612 tons)
- 47 girders
- Longest girder: 157 ft. (48 m)
- Heaviest girder: 165,000 lb.
- Goodco Z-Tech
- 20 PMG-Series unidirectional pot bearings
- 8 PF-Series fixed pot bearings
- 2 LG-5 modular joints, each 47.2 ft. (14.4 m) in length
Special features
- The launched-girder erection technique was used to erect this bridge.
- This bridge has piers 230 feet (70 m) high, among the tallest bridge piers in Quebec.
Fabrication plants
- Quebec City, QC
- Laval, QC
|
 |
|  |  |
|
|  |