| Beauharnois, QC, Canada |
 |
Project Features
Expected Completion Year: 2012
- Type of structure: 4,920-ft. (1,500 meters) highway bridge (1 span in each direction)
- General contractor: Nouvelle Autoroute 30 CJV
- Engineering firm: Arup
- Owner: Nouvelle Autoroute 30 S.E.N.C.
Construction of two 3,281-ft. (1.5 km) structures that will form part of the 6,562-ft. (2.5 km) bridge spanning the St. Lawrence Seaway at the Beauharnois Canal.
Products and services
Structal-Bridges
- Fabrication of the bridge superstructure (17,000 tons)
- 80 box girders
- Longest girder: 137 ft. (41.8 meters)
- Heaviest girder: 225 tons
Special features
- Size and weight of steel components
- Shipping logistics
Fabrication plants
- Quebec City, QC, St. Gédéon, QC, and Point of Rocks, MD
|
 |
|  |  |
|